Lab Assignments
Lab Assignments 01 through 09 are designed to give you the tools needed to complete the Design Project and are performed individually. These Lab Assignments are due at the beginning of the second lecture class before the following lab (every Thursday), the grade will be based on correctness, and will be returned during the lab.
Lab Assignments 10 through 15 are the Design Project, are performed by teams of 2 students (no team may have more than 1 graduate student), and the same grade will be given to each member of the team. Lab Assignments 10 through 13 are due at the beginning of the following lab, the grade will be based upon completion not correctness, and will be returned during the lab. Lab Assignments 14 and 15 are due , the grade will be based upon correctness, and will be returned before the final exam.
During the final Lab 15 all students will present their Design Projects on Friday, May 02, 2008. Both Lab groups 15170 & 15175 are scheduled 2:00 p.m.- 5:00 p.m. at the HP2 Lab (ECJ 3.402).
To receive full credit for a Lab Assignment, the Lab Assignment must be submitted by the due date noted for each Lab Assignment. A Late Penalty of (including weekends) will be assessed for all Lab Assignments submitted after their due date. All Lab Assignments must be turned in by at to receive any credit. No lab assignment will be accepted for grading after this time.
Lab 01 --
Lab Assignment 01 - Introduction to MicroStation --
due
Lab 02 --
Lab Assignment 02 - Leg Centerline and Lanes using MicroStation --
due
Lab 03 --
Lab Assignment 03 - Areas and Dimensioning using MicroStation --
due
Lab 04 --
Lab Assignment 04 - Pavement Edge Design with a Simple Arc of a Circle and with a Taper Section and an Arc of a Circle using MicroStation --
due
Lab 05 --
Lab Assignment 05 - Horizontal Circular Curve using GEOPAK --
due
Lab 06 --
Lab Assignment 06 - Performing Lab Assignment 02 using GEOPAK --
due
Lab 07 --
Lab Assignment 07 - Define Superelevation Runoff using GEOPAK --
due
Lab 08 --
Lab Assignment 08 - Define a Spiral Curve using GEOPAK --
due
Lab 09 --
Lab Assignment 09 - Define a Vertical Profile using GEOPAK and Introduction to the Design Project --
due
Lab 10 --
Lab Assignment 10 - Design Project Part 1 - Define the Vertical Alignment for Road 2000 over the Freeway using GEOPAK --
due
Lab 13 --
Lab Assignment 13 - Design Project Part 4 - Design the Freeway Exit Ramp of the Grade-Separated, 2-Quad, Partial Cloverleaf A Interchange using GEOPAK --
due
Lab 14 --
Lab Assignment 14 - Design Project Part 5 - Define the Superelevation and Complete the Grade-Separated, 2-Quad, Partial Cloverleaf A Interchange using MicroStation and GEOPAK --
due
to receive full credit; a late penalty of will be accessed for a late Design Project;
no Design Project will be accepted after
at
.
Lab 15 --
Lab Assignment 15 - Design Project Part 6 - Grade-Separated, 2-Quad, Partial Cloverleaf A Interchange Student Presentations --
due
to receive full credit; a late penalty of will be accessed for a late Design Project;